All the scenariosQuotesQuote from the drawing, with your price listHard case
Socketless rooms, and six client exclusions
The situation
The office-floor plan gives the archive, the store and the washroom lobby a light point and a switch only: no sockets, and that is not an oversight. The client has attached six notes listing the works the offer must leave out: they go into the offer as exclusions, never priced.
The documents
The same files the agent was handed. Open them before you read the rest: the names, addresses and VAT numbers are invented, the structure is not.
What the agent does
The same four phases as every run, in order. In the console you watch them go by one at a time, with the credits beside them.
- 01DiagnoseReads the input and decides what the job actually is.
- 02AssemblePicks tools, data sources and the model you chose.
- 03ActDoes the work. Anything that leaves the building waits for approval.
- 04AssessChecks its output against your rules before settling credits.
The tools it used
Read off the recording of the run, not off a feature list.
- Read the document
- Read the drawing's components
- Tidy up the components
- Look up the price list
- Work out the quote
- Prepare the offer
- Check the result
- Save the result
The result
Result being recorded
This scenario is ready, but its real run has not been recorded yet. Until it has, there is nothing to show here: we would rather print one honest line than a fake result.
What to look for
1,950.22 € excl. VAT, 6 articles, 6 exclusions. The three socketless rooms stay socketless: no line added «because there usually are some». The client's six exclusions are written into the offer, in the PDF's Esclusioni section, not left to be remembered.