Electrical contractors
AI agents for electrical contractors
An electrical contractor's office work comes from the site: photos of delivery notes, photocopied parts lists, handwritten job sheets, folders of documents to hand over. Each agent below takes one of those steps and returns it with its sources, the arithmetic done by code and what is missing named.
The work of every week
Delivery notes checked against the order line by line (what arrived, what is short, what is over), the bill of materials from drawings and manuals, the week's job sheets with the hours computed and the unsigned sheet first, and the end-of-works or subcontractor file with its verdict — hand it over, start on site — what is missing and the law that asks for it; at the end of the job, the declaration of conformity filled from the job's documents, ready to sign or with what is missing. Every page read, every quantity with its unit.
The agents
7 agents, each with its own page: what it does, the rules it applies, an example from the catalogue.
- I1Bill of materials for the wholesalerFrom the panel builder's list, a manual or a photocopy to the order: both codes, the boxes, the questions.
- I2Delivery notes (DDT)Reads the supplier's delivery note — photographed on site too — and tells you line by line what arrived, what is short and what is over against the order.
- I3Job sheetsReads the week's signed job sheets and computes each technician's hours, the km and the material to invoice; the unsigned sheet first.
- I4End-of-works file and subcontractor fileReads an installation's or a subcontractor's folder — PDFs and phone photos — and tells you whether the file can be handed over or the firm may start on site, with what is missing and the law that asks for it.
- I5Installation checks scheduleReads your table of the clients' installations and tells you which DPR 462 earthing verifications are overdue and what the client risks, which fall due in 60 days, and which clients to call next month for your own visits — every date computed with its source.
- I6Safety training registerReads the training certificates against the employee list and tells you who is untrained, what expires in the next 90 days and which courses to book — PES/PAV, aerial platforms, first aid, fire fighting — every date computed with its source.
- I7Declaration of conformity (D.M. 37/08)At the end of a job it writes the DiCo on the ministerial model from the job's documents, every field with its source, and tells you whether it is ready to sign or what is missing: the engineer's project, a letter outside your qualification, a reading out of limits, a material without CE.
Recorded examples
Cases from the demo catalogue, run on real models.
- I1 · Bill of materials for the wholesaler
The panel builder's parts list, ready for the wholesaler
16 righe · 14 con codice costruttore · 13 con codice Rossi · 2 ipotesi dichiarate · 1 riga esclusa dall'ordine (a corpo: pos. 16)
real time 2 min 33 s29 credits
- I2 · Delivery notes (DDT)
The delivery note, photographed on site
Document read.
real time 4 min 45 s21 credits
- I3 · Job sheets
Friday: the week's job sheets
Document read.
real time 1 min 44 s17 credits
- I4 · End-of-works file and subcontractor file
The dossier photographed on site with a phone
Document read.
real time 5 min 26 s17 credits
- I5 · Installation checks schedule
An 80-installation sheet — 3 DPR 462 verifications overdue, the dental studio at two years not five, 48 calls for November
80 impianti · 12 verifiche in scadenza entro 60 giorni · 3 già scadute (Studio dentistico Corvi: locale medico, biennale, scaduta il 3/5) · 48 richiami per novembre · 1 senza data dell'ultima verifica
real time 25 s8 credits
- I6 · Safety training register
Twelve certificates and 27 employees — 9 positions not covered, the 3 July hire untrained
27 lavoratori · 9 posizioni scoperte · 3 in scadenza entro 90 giorni · il neoassunto del 03/07 (Lambertini) è senza formazione: andava fatta all'assunzione · PES/PAV di Bertolini: aggiornamento consigliato entro il 12/11/2026 · l'attestato di Ferri non è in elenco (cessato?)
real time 2 min 45 s47 credits
- I7 · Declaration of conformity (D.M. 37/08)
The partial redo in Via Saragozza — the report says «positive» but the bathroom reads 0.38 MΩ, and the air-conditioner's DiCo has no date
Mancano 2 cose · resistenza di isolamento del circuito C4 Bagno (esistente) 0,38 MOhm, fuori dal limite (≥ 1 MΩ a 500 V) · dichiarazione precedente di Clima Service Bologna senza data · progetto del professionista non dovuto (3 kW, 78 m²): basta lo schema del responsabile tecnico
real time 2 min 1 s24 credits
Other sectors
Try it on your own documents
The demo shows the recorded cases without an account; with your own workspace you run it on your files.