Electrical contractors
AI agents for electrical contractors
An electrical contractor's office work comes from the site: photos of delivery notes, photocopied parts lists, handwritten job sheets, folders of documents to hand over. Each agent below takes one of those steps and returns it with its sources, the arithmetic done by code and what is missing named.
The work of every week
Delivery notes checked against the order line by line (what arrived, what is short, what is over), the bill of materials from drawings and manuals, the week's job sheets with the hours computed and the unsigned sheet first, and the end-of-works or subcontractor file with its verdict — hand it over, start on site — what is missing and the law that asks for it; at the end of the job, the declaration of conformity filled from the job's documents, ready to sign or with what is missing. Every page read, every quantity with its unit.
A typical week
On Monday the site foreman photographs the wholesaler's DDT from the van: of order OA-2026-0311, two lines arrived incomplete, one in excess, one package with a reservation, and the office knows what to chase before booking the invoice. On Tuesday the purchasing office sends the wholesaler the bill of materials for switchboard QG: 16 lines, 13 with the wholesaler's code, two declared assumptions and one lump-sum line left out of the order. On Wednesday Giulia opens the Excel sheet of 80 client installations: three D.P.R. 462 inspections are already overdue — a dental practice is inspected every two years, not five — and 48 clients are to be called back for November. On Thursday the RSPP compares twelve certificates with the 27 employees: nine positions uncovered and the July new hire without training. On Friday the DiCo for Via Saragozza is not to be signed: the bathroom measures 0,38 MΩ, below the 1 MΩ limit, and the previous declaration for the air conditioner has no date. And the week's eight timesheets, one scanned twice and one unsigned, give the hours for payroll.
Written from the demo catalogue cases: companies, names and amounts are those of the sample documents.
The sector's apps
Each app groups the AI agents for one job, you take it from the console Catalogue, and it works beside the ERP: its page tells you how the work arrives, where the result goes and who checks it.
- Supplier orders and delivery notesReads order confirmations and delivery notes, fills in your ERP's codes and checks them against your order: prices, quantities, substitutes, missing lines. What does not match stays with you.
- Wholesale purchasingA bill of materials for the order, offers compared and a new price list applied to yours: who is cheaper, what is missing, which prices fall below margin.
- Work sheets and progress billingFrom signed sheets to each person's hours, and at period end to what you invoice: the progress bill of a measured contract or the time-and-materials invoice.
- Site paperworkThe end-of-works file and the declaration of conformity, with the source of every figure: ready to sign, or what is missing, by name.
- Safety and inspectionsWho is not trained, what expires, which inspections of installations are late: every date worked out with its source, and the month's call list.
Watch «Supplier orders and delivery notes» at work
A 1:09 film, voice and subtitles in Italian: the app at work on a case from the demo catalogue, up to the decision that stays with you.
The agents
7 agents, each with its own page: what it does, the rules it applies, an example from the catalogue.
- I1Bill of materials for the wholesalerFrom the panel builder's list, a manual or a photocopy to the order: both codes, the boxes, the questions.
- I2Delivery notes (DDT)Reads the supplier's delivery note — photographed on site too — and tells you line by line what arrived, what is short and what is over against the order.
- I3Job sheetsReads the week's signed job sheets and computes each technician's hours, the km and the material to invoice; the unsigned sheet first.
- I4End-of-works file and subcontractor fileReads an installation's or a subcontractor's folder — PDFs and phone photos — and tells you whether the file can be handed over or the firm may start on site, with what is missing and the law that asks for it.
- I5Installation checks scheduleReads your table of the clients' installations and tells you which DPR 462 earthing verifications are overdue and what the client risks, which fall due in 60 days, and which clients to call next month for your own visits — every date computed with its source.
- I6Safety training registerReads the training certificates against the employee list and tells you who is untrained, what expires in the next 90 days and which courses to book — PES/PAV, aerial platforms, first aid, fire fighting — every date computed with its source.
- I7Declaration of conformity (D.M. 37/08)At the end of a job it writes the DiCo on the ministerial model from the job's documents, every field with its source, and tells you whether it is ready to sign or what is missing: the engineer's project, a letter outside your qualification, a reading out of limits, a material without CE.
Recorded examples
Cases from the demo catalogue, run on real models.
- I1 · Bill of materials for the wholesaler
The panel builder's parts list, ready for the wholesaler
16 righe · 14 con codice costruttore · 13 con codice Rossi · 2 ipotesi dichiarate · 1 riga esclusa dall'ordine (a corpo: pos. 16)
real time 2 min 33 s29 credits
- I2 · Delivery notes (DDT)
The delivery note, photographed on site
Document read.
real time 4 min 45 s21 credits
- I3 · Job sheets
Friday: the week's job sheets
Document read.
real time 1 min 44 s17 credits
- I4 · End-of-works file and subcontractor file
The dossier photographed on site with a phone
Document read.
real time 5 min 26 s17 credits
- I5 · Installation checks schedule
An 80-installation sheet — 3 DPR 462 verifications overdue, the dental studio at two years not five, 48 calls for November
80 impianti · 12 verifiche in scadenza entro 60 giorni · 3 già scadute (Studio dentistico Corvi: locale medico, biennale, scaduta il 3/5) · 48 richiami per novembre · 1 senza data dell'ultima verifica
real time 25 s8 credits
- I6 · Safety training register
Twelve certificates and 27 employees — 9 positions not covered, the 3 July hire untrained
27 lavoratori · 9 posizioni scoperte · 3 in scadenza entro 90 giorni · il neoassunto del 03/07 (Lambertini) è senza formazione: andava fatta all'assunzione · PES/PAV di Bertolini: aggiornamento consigliato entro il 12/11/2026 · l'attestato di Ferri non è in elenco (cessato?)
real time 2 min 45 s47 credits
- I7 · Declaration of conformity (D.M. 37/08)
The partial redo in Via Saragozza — the report says «positive» but the bathroom reads 0.38 MΩ, and the air-conditioner's DiCo has no date
Mancano 2 cose · resistenza di isolamento del circuito C4 Bagno (esistente) 0,38 MOhm, fuori dal limite (≥ 1 MΩ a 500 V) · dichiarazione precedente di Clima Service Bologna senza data · progetto del professionista non dovuto (3 kW, 78 m²): basta lo schema del responsabile tecnico
real time 2 min 1 s24 credits
Frequently asked questions
Do AI agents also read photos taken on site?
Yes. The delivery note photographed from the van, the timesheets run through the scanner, the file photographed with a phone on the site bench are read like PDFs: every page read, every quantity with its unit. What cannot be read — a rating under the toner, an unsigned sheet — is named, instead of being guessed.
Does it work with my ERP?
Yes, beside it. The agent reads what your ERP can already export — Excel, CSV, XML — or a table of its database through a read-only login, and hands back files ready to import. There is no direct connector to a specific ERP, and it never writes into your ERP by itself: you decide what to import.
Who checks what the agent did?
You do — and it takes a minute, not an afternoon. Every run is a trace: the live timeline, each tool call, each document read, the cost per step, the confidence and sources. Actions that leave the building wait for your approval. The platform never sends, never touches a live store, never moves money.
Guides for this sector
- Delivery note (DDT) not matching the order: what to do
- Processes automated with AI: which jobs fit and how to start
- Job sheets: from the technicians' hours to what gets invoiced
- Declaration of conformity (D.M. 37/08): what to attach and what to check
- AI agent for installation companies: from the quote to the declaration of conformity
Other sectors
Try it on your own documents
The demo shows the recorded cases without an account; with your own workspace you run it on your files.