GuideI7 · Declaration of conformity (D.M. 37/08)
AI agent for installation companies: from the quote to the declaration of conformity
For installers the work is drawings, job sheets, price lists and papers to hand over. These are the agents built for it, and what each one does.
General information, not legal, tax or technical advice: for your own case, check the rules cited with a professional.
#The installer's jobs, one by one
- Quote from a drawing. From the electrical drawing to the quote, with the price list; items missing from the list are not priced by eye.
- Bill of materials for the wholesaler. From the panel's parts list to an order ready for the wholesaler.
- Job sheets. Technicians' hours from the job sheets, by grade and rate.
- Progress billing and time-and-materials. From job sheets to the progress statement or a draft invoice: see the guide progress billing from job sheets.
- Declaration of conformity. The checks before signing the DiCo: see DM 37/08, the DiCo attachments.
- End-of-works and subcontractor file. The documents to collect and what is missing.
- Periodic installation checks (DPR 462) and safety training: the schedules, with what is about to expire.
- Supplier invoices and delivery notes, checked against the order.
All the sector's agents are on the installers page, each with its recorded example.
#How it fits into the day's work
The agent reads documents where they already arrive, works leaving every step traced and returns a result to check: a CSV or Excel to import into the ERP, a PDF report, a written reply. It never writes into the ERP by itself, and confirmations and documents do not leave the company without your approval.
#Frequently asked questions
#Is there an AI agent for installation companies?
Yes: Agent Flow Bind has agents for quotes from drawings, the wholesaler's bill of materials, job sheets, progress billing, the declaration of conformity, the end-of-works file, periodic checks and safety training.
#Does the agent sign the declaration of conformity?
No. The agent checks the file and flags what is missing; the signature and the approval stay with you.
#Does it connect to the company's ERP?
It returns CSV or Excel to import into the ERP; it can read documents from a folder, an SFTP or the ERP's exports.
The agent that does this job
The steps above are what the Declaration of conformity (D.M. 37/08) agent applies on every run: open it to see what it takes in, what it checks and what it hands back.
More guides
- Declaration of conformity (D.M. 37/08): what to attach and what to check
- Delivery note (DDT) not matching the order: what to do
- Processes automated with AI: which jobs fit and how to start
- Job sheets: from the technicians' hours to what gets invoiced
- Splitting condominium expenses on the millesimal tables