All the scenariosElectrical contractorsBill of materials for the wholesalerComplex
Manual at revision A, drawing at revision B: what gets ordered
The situation
For the QG board the panel builder's technical file arrives at revision A, with the parts-list drawing at revision B behind it. The two revisions disagree: the sockets' RCD went from type AC to type A and the terminals from 20 to 24, and the manual lists a recommended spare the drawing does not. Purchasing has to send the order to Rossi Componenti with the right codes, and Rossi's price list is in Knowledge.
The documents
The same files the agent was handed. Open them before you read the rest: the names, addresses and VAT numbers are invented, the structure is not.
What the agent does
The same four phases as every run, in order. In the console you watch them go by one at a time, with the credits beside them.
- 01DiagnoseReads the input and decides what the job actually is.
- 02AssemblePicks tools, data sources and the model you chose.
- 03ActDoes the work. Anything that leaves the building waits for approval.
- 04AssessChecks its output against your rules before settling credits.
The result
Result being recorded
This scenario is ready, but its real run has not been recorded yet. Until it has, there is nothing to show here: we would rather print one honest line than a fake result.
What to look for
The first line reads «17 righe · 15 con codice costruttore · 14 con codice Rossi … rev. B vince su A (pos. 6, pos. 12; R1 solo nel manuale)». Position 6 is the type A RCD (A9R21240, Rossi SEA9R21240), not the manual's type AC; the 24 terminals become one box of 50 with the leftover; spare R1 is ordered; no questions, and the order e-mail draft to Rossi is ready.