The flat rewired in Via Mascarella — 4.5 kW and 92 m²: no engineer needed, 18 readings within limits, ready to sign
The situation
It is 16 September: Acme Impianti has finished rewiring the Gualandi flat. The office has the job sheet from the management software, the visura, Ing. Colombo's schema S-117, the exported materials list, three job sheets and the test report. The DiCo used to be filled by hand from six documents; now they need to know whether it can be signed, and have it ready in Word.
The documents
The same files the agent was handed. Open them before you read the rest: the names, addresses and VAT numbers are invented, the structure is not.
scheda-commessa-2026-117-gualandi.pdf
visura-camerale-acme-impianti-2026-09-02.pdf
schema-impianto-s-117-via-mascarella.pdf
distinta-materiali-commessa-2026-117.xlsx
rapportini-commessa-2026-117.pdf
verbale-verifiche-rv-2026-117.pdf
What the agent does
The same four phases as every run, in order. In the console you watch them go by one at a time, with the credits beside them.
- 01DiagnoseReads the input and decides what the job actually is.
- 02AssemblePicks tools, data sources and the model you chose.
- 03ActDoes the work. Anything that leaves the building waits for approval.
- 04AssessChecks its output against your rules before settling credits.
The result
Result being recorded
This scenario is ready, but its real run has not been recorded yet. Until it has, there is nothing to show here: we would rather print one honest line than a fake result.
What to look for
«Pronta da firmare» on top. The code says why no engineer is needed — a dwelling within 6 kW and 400 m² (art. 5 c. 2 lett. a) — and that the responsible technician's schema is the project (art. 7 c. 2); the report's 18 readings checked one by one against the CEI 64-8 limits (the lowest, 220 MΩ on the bathroom; earth 38 Ω against 1,667); the visura's letter A covers every lavorazione; the five attachments, with the materials report written from the list. Beside it, the DiCo filled field by field with the document each value comes from, the Word and PDF draft, and the town-hall (SUE) deposit by 15 October.