The progress-report folder, before sending it
The situation
The steelworks digitalised its welding line with a grant: the consultant gets the progress-report folder — thirty documents, invoices, statements, transfer receipts, timesheets — and has to know before the controller what passes. Two transfers left without the CUP in the reference, one invoice still lacks its proof of payment, and there is a lunch.
The documents
The same files the agent was handed. Open them before you read the rest: the names, addresses and VAT numbers are invented, the structure is not.
What the agent does
The same four phases as every run, in order. In the console you watch them go by one at a time, with the credits beside them.
- 01DiagnoseReads the input and decides what the job actually is.
- 02AssemblePicks tools, data sources and the model you chose.
- 03ActDoes the work. Anything that leaves the building waits for approval.
- 04AssessChecks its output against your rules before settling credits.
The tools it used
Read off the recording of the run, not off a feature list.
- Checks the grant report
- Save the result
The result
Su 30 documenti: 14.628,75 € ammissibili, 4.280 € in attesa di tre prove precise, 194,55 € non ammissibili, 2 fatture senza CUP in causale: correggile prima di inviare
To fix before sending
- S03 — il CUP nella causale del bonifico del 12/08/2026 a favore di Piattaforme Emilia S.r.l. (1.159,00 €, causale «BONIFICO A FAVORE DI PIATTAFORME EMILIA SRL FT PE-0177 NOLEGGIO PLE LUGLIO»): la dichiarazione sostitutiva che lo riconduce al CUP B37H26000410008
- S04 — il CUP nella causale del bonifico del 14/08/2026 a favore di Acme Impianti S.r.l. (2.915,80 €, causale «BONIFICO A FAVORE DI ACME IMPIANTI SRL SALDO FT 112 DEL 15/07/2026»): la dichiarazione sostitutiva che lo riconduce al CUP B37H26000410008
- S10 — la quietanza della FT 2026/A-260 del 14/08/2026 (1.146,80 €, scadenza 13/09/2026): l'estratto conto di settembre 2026 o la contabile del bonifico
| Expense | Amount | Outcome | Allowed |
|---|---|---|---|
| Materiale per il nuovo impianto di illuminazione e il quadro di reparto dello stabilimento di Via Larga 210, Bologna.beni_strumentali · Jul 3, 2026 · p. 2 | €2,480.00 | eligibleIl bando (documentazione di spesa);… | €2,480.00 |
| Fornitura per il relamping LED dello stabilimento Ferraresi.beni_strumentali · Jul 7, 2026 · p. 5 | €1,860.00 | eligibleIl bando (documentazione di spesa);… | €1,860.00 |
| Noleggio piattaforma aerea semovente 14 m, con trasporto A/R, per il montaggio dei corpi illuminanti.servizi · Jul 13, 2026 · p. 6 | €950.00 | needs evidencep. 1 (CUP nella causale del pagamento) | €0.00 |
| Lavori eseguiti presso lo stabilimento di Via Larga 210 dal 13 al 17/07/2026.beni_strumentali · Jul 15, 2026 · p. 7 | €2,390.00 | needs evidencep. 1 (CUP nella causale del pagamento) | €0.00 |
| Corso di formazione sul sistema MES di reparto: 3 addetti, 12 ore in aula e in linea.formazione · Jul 20, 2026 · p. 9 | €540.00 | eligibleIl bando (documentazione di spesa);… | €540.00 |
| Schweißdaten-Erfassungsmodul SDE-4 mit Stromsensoren, Montage und Inbetriebnahme.software · Jul 22, 2026 · p. 10 | €3,180.00 | eligibleIl bando (documentazione di spesa);… | €3,180.00 |
| pranzo con i tecnici Hansen messa in servizio SDE-4rappresentanza · Jul 28, 2026 · p. 12 | €194.55 | not eligibleIl bando (spese non ammissibili) | €0.00 |
| Prestazione resa in esecuzione della lettera d'incarico del 02/07/2026.consulenze · Jul 31, 2026 · p. 15 | €1,600.00 | eligibleIl bando (documentazione di spesa);… | €1,600.00 |
| Licenza d'uso perpetua modulo MES Saldatura, 4 postazioni, con configurazione iniziale.software · Aug 3, 2026 · p. 16 | €1,200.00 | eligibleIl bando (documentazione di spesa);… | €1,200.00 |
| Materiale consegnato in stabilimento il 14/08/2026.beni_strumentali · Aug 14, 2026 · p. 17 | €940.00 | needs evidenceIl bando (documentazione di spesa);… | €0.00 |
| Personale — Galletti Bruno, luglio 2026: 42 h × 30,15 €personale · Jul 31, 2026 · p. 22 | €1,266.30 | eligibleReg. (UE) 2021/1060 art. 55 c. 2 (1.720… | €1,266.30 |
| Personale — Galletti Bruno, agosto 2026: 38 h × 30,15 €personale · Aug 31, 2026 · p. 23 | €1,145.70 | eligibleReg. (UE) 2021/1060 art. 55 c. 2 (1.720… | €1,145.70 |
| Personale — Galletti Bruno, settembre 2026: 45 h × 30,15 €personale · Sep 30, 2026 · p. 24 | €1,356.75 | eligibleReg. (UE) 2021/1060 art. 55 c. 2 (1.720… | €1,356.75 |
Contributo 50 % di 14.628,75 € = 7.314,38 €; cofinanziamento a carico dell'impresa 7.314,37 €. Con le prove in attesa il contributo sale a 9.454,38 €.
real time 4 min 25 s47 credits
Minute by minute
- 0 sAct4 credits
- 45 sToolChecks the grant report0 credits
- 45 sAssess22 credits
- 2 min 32 sAssess1 credit
- 2 min 42 sAct4 credits
- 3 min 24 sToolChecks the grant report0 credits
- 3 min 24 sAssess15 credits
- 4 min 22 sAssess1 credit
- 4 min 25 sToolChecks the grant report0 credits
- 4 min 25 sToolSave the result0 credits
What to look for
The first line says what to fix before sending: €14,628.75 eligible, €4,280 waiting for three exact proofs — the sworn declaration for the transfers to Acme and Piattaforme Emilia sent without the CUP, the September statement for invoice A-260 — and the lunch with the technicians excluded. Below, each cost with its invoice, its transfer and the page; the grant (€7,314.38, €9,454.38 with the proofs) and the table for the portal.