All the scenariosQuotesQuote from the drawing, with your price listComplex
Two floors, one offer
The situation
The ground- and first-floor drawings of unit A arrive in one file, each with its own take-off. The client wants a single offer: the thirteen articles have to be added across the two floors, the two boards make one line, and cable and conduit are priced by the metre. On the first floor a revision cloud struck two sockets and added a double one: the take-off is already up to date.
The documents
The same files the agent was handed. Open them before you read the rest: the names, addresses and VAT numbers are invented, the structure is not.
What the agent does
The same four phases as every run, in order. In the console you watch them go by one at a time, with the credits beside them.
- 01DiagnoseReads the input and decides what the job actually is.
- 02AssemblePicks tools, data sources and the model you chose.
- 03ActDoes the work. Anything that leaves the building waits for approval.
- 04AssessChecks its output against your rules before settling credits.
The tools it used
Read off the recording of the run, not off a feature list.
- Read the document
- Read the drawing's components
- Tidy up the components
- Look up the price list
- Work out the quote
- Prepare the offer
- Check the result
- Save the result
The result
Result being recorded
This scenario is ready, but its real run has not been recorded yet. Until it has, there is nothing to show here: we would rather print one honest line than a fake result.
What to look for
6,727.20 € excl. VAT, 13 articles, none off-list: one line per article with the two floors' quantities already added, the two boards on one line of 2, the metres of cable and conduit measured off the drawing rather than counted as pieces.