All the scenariosElectrical contractorsSafety training registerComplex
Bassi from the warehouse to a team from 12 October — the aerial-platform course enters the plan
The situation
On 1 October the safety officer updates the workbook: from 12 October Bassi leaves the warehouse for an installation team, with the aerial platform and electrical work. Same September certificates, new workbook: the register has to be recomputed.
The documents
The same files the agent was handed. Open them before you read the rest: the names, addresses and VAT numbers are invented, the structure is not.
What the agent does
The same four phases as every run, in order. In the console you watch them go by one at a time, with the credits beside them.
- 01DiagnoseReads the input and decides what the job actually is.
- 02AssemblePicks tools, data sources and the model you chose.
- 03ActDoes the work. Anything that leaves the building waits for approval.
- 04AssessChecks its output against your rules before settling credits.
The result
Result being recorded
This scenario is ready, but its real run has not been recorded yet. Until it has, there is nothing to show here: we would rather print one honest line than a fake result.
What to look for
The change of job recomputes the register: the 10-hour aerial-platform course and the PES/PAV course enter the plan dated 12 October — training comes before the change (art. 37 c. 4), not after — and are not yet positions not covered. Bassi's forklift licence stays valid.