Apps2 agents
Site paperwork: the end-of-works file and the declaration of conformity
The end-of-works file and the declaration of conformity, with the source of every figure: ready to sign, or what is missing, by name.
Watch the app at work
A 1:07 film, voice and subtitles in Italian: the app at work on a case from the demo catalogue, up to the decision that stays with you.
The job it does
At every end of works the office of an installation company fills in the declaration of conformity by copying from five documents: company record with qualifications, job sheet, design or diagram, bill of materials, test report. The app writes it on the ministry's form from the job's documents, every field with the document it comes from, and tells you whether it is ready to sign. A second agent reads the folder of the installation or the subcontractor — DURC, POS, certificates, appointments — and tells you whether the file can be handed over or the company may enter the site.
What it checks
The gaps have a name: the engineer's design that is needed, a letter outside the qualification, a test outside its limit, a material without CE. Below the insulation test threshold the declaration cannot say «passed». The professional's design is not due below the thresholds: the technical manager's diagram is enough. Deadlines — DURC, certificates, filing with the one-stop desk within 30 days of the end of works — are worked out by code. Open files are in «Files».
How it works with your ERP
The job's documents arrive by e-mail or as photos of the folder at a dedicated address. Jobs and materials are read from your ERP — job sheet, bill of materials and work sheets — or you upload them with the file. Out come the draft declaration in PDF and Word, with the source of every field, and an e-mail already written to ask for what is missing, never sent by itself.
When you take the app from the Catalogue it asks three questions. These are the answers you can give:
- How do the job's documents reach you?
- By e-mail or as photos of the folder proposed
- I upload them when needed
- Where does it take jobs and materials from?
- From the ERP · I connect it later
- I upload them with the file proposed
- Who signs the declaration?
- One or more people of your workspace: without their approval the result is not final.
No certified integration with any ERP: the app reads documents where they arrive, Excel or CSV exports and, if you connect it, the ERP's database with a read-only user. It returns CSV, Excel or PDF files that a person approves before importing them: it writes nothing into the ERP without your confirmation.
The app's agents
- I4End-of-works file and subcontractor fileReads an installation's or a subcontractor's folder — PDFs and phone photos — and tells you whether the file can be handed over or the firm may start on site, with what is missing and the law that asks for it.
- I7Declaration of conformity (D.M. 37/08)At the end of a job it writes the DiCo on the ministerial model from the job's documents, every field with its source, and tells you whether it is ready to sign or what is missing: the engineer's project, a letter outside your qualification, a reading out of limits, a material without CE.
Examples from the demo catalogue
A case from the demo catalogue, with anonymised documents.
End-of-works file and subcontractor file
The dossier photographed on site with a phone
Board QS-5's file was never scanned: it is nine phone photographs taken on the site bench, one declaration split across two shots, the phone's shadow and the lamp's reflection in the corners. The declaration is signed and stamped, the test report says «esito positivo» and the chamber-of-commerce extract is there. At the end there is also a photo of the board on the wall, which is not a document.
The recorded result
Document read.
real time 5 min 26 s17 credits
Declaration of conformity (D.M. 37/08)
The partial redo in Via Saragozza — the report says «positive» but the bathroom reads 0.38 MΩ, and the air-conditioner's DiCo has no date
In Via Saragozza Acme redid the board, the kitchen and the living-room sockets; the bathroom and bedrooms stayed as in 2003, as the client wanted. The technician closed the report with «Esito complessivo: POSITIVO» and a note on the bathroom. The client sent a photo of Elettrica Reno's old DiCo; he cannot find the copy for the air-conditioner line Clima Service redid in 2019. Can it be signed?
The recorded result
Mancano 2 cose · resistenza di isolamento del circuito C4 Bagno (esistente) 0,38 MOhm, fuori dal limite (≥ 1 MΩ a 500 V) · dichiarazione precedente di Clima Service Bologna senza data · progetto del professionista non dovuto (3 kW, 78 m²): basta lo schema del responsabile tecnico
real time 2 min 1 s24 credits
End-of-works file and subcontractor file
The subcontractor's folder before Monday
On Friday evening Murature Idice's folder arrives; on Monday the firm is due in block D of Palazzo Santoro for chasing and builder's work: fourteen sheets of chamber-of-commerce extract, DURC, risk assessment, site safety plan, list of workers, training certificates, appointments and declarations. Before Monday the main contractor's technical office has to decide whether the firm may start.
Result being recorded
Frequently asked questions
What is needed to prepare the declaration?
The job's documents as you have them: the company record with qualifications, the job sheet, the design or diagram, the bill of materials, the work sheets, the test report. From these the app fills in every field and writes the materials report from the bill.
What happens after signing?
Handing over to the client and filing with the one-stop desk become deadlines in «Files», with a reminder a few days before. The signature stays with the declarant and the technical manager: the app does not sign.
Which rules does it check the file against?
A checklist with its sources cited — D.M. 37/08 and annex XVII — that you can edit. The due dates of DURC, certificates and attestations are worked out by code; every gap comes with its source and the e-mail to send to whoever must complete it.
Does the agent sign it?
No: the agent prepares the draft in Word and PDF, every field with the document it comes from, and tells you whether it is ready to sign or what is missing. You sign and send it; thresholds, letters and test limits are checked by code.
Sectors and guides
The other apps
- Supplier orders and delivery notes
- Supplier invoices
- Expense claims
- Quotes
- Wholesale purchasing
- Work sheets and progress billing
- Safety and inspections
- Condominium
- Files and due diligence
- Bank and reconciliation
- Collections and reminders
- Contracts and deadlines
- PEC and court documents
- Grant reporting
- Monthly report
- Tutor for new hires
- Find customers
- Phone reception
Try it on your own documents
The demo shows the recorded cases without an account; with your own workspace you run it on your files.