I7 · Declaration of conformity (D.M. 37/08) · After the partial redo
The partial redo in Via Saragozza — the report says «positive» but the bathroom reads 0.38 MΩ, and the air-conditioner's DiCo has no date
In Via Saragozza Acme redid the board, the kitchen and the living-room sockets; the bathroom and bedrooms stayed as in 2003, as the client wanted. The technician closed the report with «Esito complessivo: POSITIVO» and a note on the bathroom. The client sent a photo of Elettrica Reno's old DiCo; he cannot find the copy for the air-conditioner line Clima Service redid in 2019. Can it be signed?
- 2 min 1 s
- real time
- 24
- credits
Replay it in the Demo Open the report (PDF)Read the whole scenarioClose the story











